Tuesday, December 27, 2005

Wonders of New China (10)

    Linked Hybrid, Beijing
    Steven Holl Architects;
    Li Hu, lead architect

    Scheduled for completion in 2008

    Linked Hybrid, which will house 2,500 people in 700 apartments covering 1.6 million square feet, is a model for large-scale sustainable residential architecture. The site will feature one of the world's largest geothermal cooling and heating systems, which will stabilize the temperature within the complex of eight buildings, all linked at the 20th floor by a "ring" of service establishments, like cafés and dry cleaners. A set of dual pipes pumps water from 100 meters below ground, circulating the liquid between the buildings' concrete floors.

    The result: The water-circulation system serves as a giant radiator in the winter and cooling system in the summer. It has no boilers to supply heat, no electric air conditioners to supply cool. The apartments also feature gray-water recycling -- a process that's just starting to catch on in Beijing in much smaller buildings -- to filter waste water from kitchen sinks and wash basins back into toilets.

Post Title

Wonders of New China (10)


Post URL

https://blognews12.blogspot.com/2005/12/wonders-of-new-china-10.html


Visit All News Blog for Daily Updated All News Blog Collection

No comments:

Post a Comment

Popular Posts

My Blog List

Blog Archive